FORTACRETE® Structural Panel
Handling Procedures
FORTACRETE® Structural Panels weigh between 140 to 150 pounds per panel and are designed to be carried and installed by two people.
Because of the weight of these panels, it is important that they are always laid flat on the floor or flat over the framing, in a horizontal position. Prior to installation on the floor framing, panels may be placed on pallets or timbers. Panels may be placed on pallets or timbers spaced a maximum of 4’ o.c. with the end supports within 1’ of the ends of the panel.
FORTACRETE Panels must never be stored in an upright position, on their edges, leaning against a wall or other vertical support. This creates a tipping hazard. If these panels tip over they could cause serious injury or death.
When placing pallets of material on a floor or floor frame it is imperative that the pallet be located over load bearing walls and framing that are capable of supporting the total load of a 20 piece pallet, which range between 3000 to 3100 pounds. Consult a qualified structural engineer or design professional, as required, for safe and proper distribution of pallets of FORTACRETE Panels over a floor frame and/or floor structure.
FORTACRETE Structural Panels are cement based and are reinforced with glass fiber. Wear protective gloves to prevent any irritation to hands from the cement or glass fiber.
Cut panels with a carbide tipped circular saw equipped with a dry dust collection device or a dust wetting device to limit the amount of airborne dust. Dispose of the collected dust in a safe manner in compliance with local codes and regulations. When cutting panels always wear a NIOSH approved dust mask and wear safety glasses.
|